



















£1,080.00*
£99.99

Product information
Vogel's RISE WBS86 Whiteboard Set – Versatile whiteboard extension for 86" displays
With the Vogel's RISE WBS86 Whiteboard Set, you can transform your interactive 86-inch display into a complete presentation and teaching solution. This high-quality accessory allows you to mount two whiteboard wings to the left and right of the screen. Ideal for schools, businesses and training rooms that want to combine digital and analogue content.
The system is compatible with all RISE floor-to-wall solutions, trolleys and stands and can be installed in minutes thanks to its intelligent measuring scale.
Product highlights of Vogel's RISE WBS86 whiteboard set:
- Optimised for 86" displays: Universally applicable with interactive and non-interactive displays.
- Robust whiteboards: Made of durable, enamelled steel – scratch-resistant, magnetic.
- Innovative hinge system: Whether open, half-open or closed, you can write comfortably at any time with consistent friction.
- Easy to adjust: Height and depth adjustment for a perfect fit to the display.
- Magnetic closure: Ensures flush and stable positioning on the screen.
- Easy to install: With a measuring scale for precise alignment – installation takes approx. 15–20 minutes.
- Compatible with RISE solutions: For mounting on Vogel's RISE trolleys, stands or floor-to-wall lifts.
Who is this set suitable for?
- Teachers and schools who want to use interactive whiteboard solutions in a modern and effective way
- Companies that need flexible presentation solutions for meeting rooms
- Educational institutions that want to combine analogue and digital teaching methods
Conclusion: Complete solution for your display lift
The Vogel's RISE WBS86 whiteboard set is the perfect addition to 86-inch displays and offers sophisticated functionality for everyday use. Whether in schools or businesses, you benefit from durable quality, intuitive handling and maximum flexibility.
Order online now, or get individual consulting from our AV experts at visunext in advance!
Technical data
| Name | Vogels RISE WBS86 Whiteboard Set 86" for RISE 2xxx and RISE 4xxx |
|---|---|
| Article number | 1000035808 |
| GTIN/EAN | 8712285410543 |
| Manufacturer SKU | 7300860 |
| Model name | RISE WBS86 |
| Brand | Vogels |
| Product Type | Whiteboard |
| General Surface | Hard |
| Mount type | Wall |
| Whiteboard technology | passive electromagnetic |
| Product width | 414.7 cm |
| Product height | 115.7 cm |
| Weight | 60 kg |
| Colour | White |
| Condition | New |
| Warranty | 60 Month |
Product safety
| Person responsible for the EU |
|---|
| Vogel's Products BV |
| In den Fichten 34 |
| 32584 Löhne |
| Germany |
| (0) 5731 – 869170 |
| info.de@vogels.com |
